MAPSA

You are here:
  • narrow screen
  • wide screen
  • Increase font size
  • Default font size
  • Decrease font size
  • default color
  • blue color
  • green color
introduction mc PDF Print E-mail
Written by Administrator   
Monday, 03 August 2009 11:04

MC Group

Vision: The most capable Iranian company in the field of MC In Iran in the next five years

In the Middle East in the next ten years

 

Introducing MC Group

MC group commenced their activities simultaneous with starting the national project of CNG refueling stations construction in 2003. From early in the year 2008, at the same time of beginning petrol consumption sharing, the sooner constructing & commissioning CNG refueling stations was taken under consideration and on this basis in order to quickly start up the CNG stations ,MAPSA Co. did their best to realize the national purpose of fuel consumption optimization.

MAPSA Co. in cooperation with of the highly experienced workforce and relying on the project management knowledge and the powerful & dynamic managerial system has been able to manage the diverse projects in the field of oil refinery & hydromechanical equipment inspection, design & construction of the CNG refueling stations, and the numerous projects of development.

Last Updated on Monday, 10 August 2009 13:17
 

Main Menu